INTAKE-DESIGN-CAFE-PROJECTS-NSO-CAPEX.md
# Cafรฉ Projects, Site Feasibility, 7-Gate NSO/CapEx & India Ground Site Kiosk Operations (`STOP 2A ยท BO-PACK-PROJECTS ยท T1-9C ยท T1-14 ยท POWERPLAY / ONSITE / PROCORE BENCHMARK`)
> **Harley's Executive 2-Page Readout (0.5p Summary + 1.5p Full Design + Collapsible Glossary)** ยท **โ
Peer-Reviewed by Astra Extra High (`gpt-6-astra xhigh`) + Claude Opus 4.7 Extra High** ยท โ
Peer-Reviewed (Astra XHigh + Opus 4.7) ยท Master Projects 2026โ27 (8 Tabs) ยท Site Feasibility & 4-Tier Sanction ยท 7-Gate NSO & 30 Checks ยท Project Site Kiosk (Tier 1 & 1.5) ยท Ad-Hoc Thekedar/Hajiri Attendance ยท Split/Night-Shift Check-In ยท Visual Site GRN & E-Way Bill ยท Voice/Photo Material Indent ยท 5 India Ground Realities (Mall Night Permits, UPI Imprest, Hindrance Register, Raw Water TDS/DISCOM kVA, Outward Scrap Gate Pass)
> **๐ 100% INTAKE & DESIGN GATES LOCKED BY OWNER (`App 0 -> App 6` ยท `2026-10-22 22:44 IST` โ Ratified by `cfo@harleys.com`) ยท `G1 DESIGN GATE LOCKED & SIGNED OFF BY OWNER (2026-10-22 22:39 IST)` ยท STEP 2 & 3 BUILD EXECUTION ACTIVE (`App 0 โฅ App 1a -> App 1b -> App 2 -> Apps 3..6`)**
> - **`A1` (`R1` ยท `App 0 -> App 8` Finalization Sequence โ LOCKED):** `App 0 (Shell, Sticky Filters FV-1..12, Bot O-048, CI/CD TC-1..14, Enablement EN-01..19) โฅ App 1a (Identity Spine SP0+SP1: hop.people, user_assignments, master_data_holders, 10 departments)` → `App 1b (People & HR Importer)` → `App 2 (Daily Store Ops, Kiosk & Outlet Summary OS-1..7)` → `App 3 (Legal & Compliance)` → `App 4 (Fixed Assets & Maint)` → `App 5 (Cafรฉ Projects)` → `App 6 (7-Stage NPL)` → `App 7 (Cross-App UAT Gate)` → `App 8 (Post-Pilot Wave)`.
> - **`A2` (`BS-04 & BS-07` ยท Shift Swaps, Inter-Outlet Loans & Outlet Master Fields โ LOCKED WITH OWNER REFINEMENT):** **"Outlet Manager / Cluster Manager should approve with visibility to City Head"** โ Both intra-outlet shift swaps (`staff_shift_rosters`) and inter-outlet crew loans (`staff_inter_outlet_loans`) are approved by **Outlet Manager OR Cluster Manager (`approved_by_role IN ('outlet_manager', 'cluster_manager')`)**, and every approval automatically grants visibility and emits an audit-trail feed notification (`city_head_notified_at TIMESTAMPTZ`) to the **City Head (`city_head`)**. Locks all 12 core `outlets` master fields (`BS-07`).
> - **`A3` (`OV-6 & AD-1..4` ยท Multi-Outlet Team Rollup Scope โ LOCKED):** Aggregate team follow-through counts and outlet rollups (`My Team AD-1..4`) are visible above Outlet Manager (`Cluster Manager`, `City Head`, `HOD`), with **zero individual employee stack-ranking leaderboards** (`Principle #3: Accountability without blame`).
> - **`A4` (`SK-14 / N-11 / OA-06 / OA-07` ยท Named Reviewers & Template Owners โ LOCKED):** Seeds `hindi_reviewer`, `quality_reviewer`, `restricted_item_owner` (`OA-06`), and `fitout_template_owner` (`OA-07`) as configurable role slots inside `master_data_holders` so named individuals can be assigned/updated in the UI without blocking build.
> - **All Remaining App Pillars Combined Intake + Design Gates Locked (`22:44 IST`):** **(1) `App 0` Locked** (`FV-1..12` Sticky 5-Filter Set `Period, Cities, Type, Outlet, Brand`, Left-Rail Foot `Filters` + `280px` Docked Pane, Role-Published Views `R15`, `O-048` 7-Context Sticky Bot Chips); **(2) `App 3` (`Stop 1` Compliance) Locked** (Standalone 4-Pillar Legal App + Embedded `60s` Outlet-Only Inspector Mode hiding leases/litigation, `60/30/14/7d` Expiry Alerts `DF-4`, Masked Licence Numbers `CM-1`, ClamAV `'PENDING'`-default S3 Vault `CM-2`); **(3) `App 4 & App 5` (`Stop 2` Assets, Maintenance & Cafรฉ Projects) Locked** (`1,982` QR Fixed Assets, `>40% WDV` Repair-vs-Replace CFO Gate, 6-State Maintenance with 2nd-Person Store Operator Verify, 9-Gate Cafรฉ Projects NSO with `Water TDS <= 80ppm` Boiler Gate, 4-Photo Site GRN & Gate 6 Auto-Asset Minting); **(4) `App 6` (`Stop 3` 7-Stage NPL) Locked** (`L1..L7` single named owner per gate, CK `<=90m` Blast Chill & Probe `<=+5ยฐC` Cold-Chain Gate, First-10-Orders Open-Box Rider Gate, 5-Axis Rollout Adoption Roll-Up, Stage 7 `30/60/90d` Margin Kill/Keep Gate).
---
## PART 1 ยท EXECUTIVE SUMMARY (0.5 PAGE)
### 1A. What We Are Building & Why
- **Complete `Master Projects - 2026 to 2027.xlsx` (8 Tabs) + `BO-PACK-PROJECTS` (`PRJ-J01..J10`, `PRJ-01..PRJ-12`, `PRJ-Q1..Q7`):** Governs **Site Scouting & Business Feasibility (`PRE-* -> PRJ-*` CFO Sanction Gate: `Rent <= 12%/15%`, `4-Wall Margin >= 35%`, `Payback < 24m`, `3-Phase Power kVA`, `Sister-Store Cannibalization <= 8%`)**, **4-Tier Separate Typed Authority (`PRJ-Q2`: Sanction != PO != Invoice/GST/TDS != Bank UTR)**, **Estimate-at-Completion (`EAC`) Budget Control**, and **7-Gate NSO, Cloud Kitchen, Airport & Store Renovation Delivery (`Gate 0..Gate 6`, Domino's/Starbucks `28โ35d` buildout SLA, 30 Pre-Opening Checks, `IT-04 โน0 Test-Order Variance`, `5โ10%` 12-Month DLP Holdback, and automated `HRL-AST-*` QR asset minting)**.
- **Dedicated Project Site Kiosk Mode (`Tier 1 Illiterate Crew` + `Tier 1.5 Site Engineer Mid-Way Mode`) for Ground-Level Operations:** Purpose-built for construction sites (`360px` rugged phone/tablet at site entrance with `EN / Hindi / Telugu` audio read-aloud): **(1) Ad-Hoc & Contractor (`Thekedar / Hajiri`) Attendance** (`project_site_attendance`: Trade Pictogram + Group/Individual Selfie + Headcount + Phone/Aadhaar Last-4 for masons, carpenters, MEP, HVAC, plumbers, painters, unloading labour & visiting architects); **(2) In-Between / Split-Shift & Mall Night-Shift Check-In (`project_shift_spans`):** multi-visit daytime + restricted **Mall Night-Work (`23:00โ05:00`)** check-in/out with GPS + selfie; **(3) Visual Site GRN (`project_site_grns`):** Delivery Challan/Invoice photo + **E-Way Bill QR** + Unloaded Crate photo + **Lorry Number Plate** + 3-Way PO match + automatic **`STAGE_DELIVERED_AT_SITE` Fixed Asset QR pre-minting**; **(4) 1-Tap Material Request / Site Indent (`project_material_indents`):** Pictogram + **Voice-Note (`EN/Hindi/Telugu`)** + Sample Photo indent routed to **`๐จ Work-Stopped (Local UPI Imprest Buy)`** vs **`๐ฆ Central PO`**.
- **5 Additional India-Specific Ground Project Controls (Benchmarked against Powerplay, Onsite, Falconbrick & Indian Retail NSO Ops):** **(6A) Mall / Landlord Night-Work Permit, Hot-Work Permit & Worker Gate-Pass Tracker** (prevents night crews from being turned away at mall security); **(6B) Site Petty Cash / UPI Imprest ('Naka / Unloading / Chillar') Ledger** (UPI screenshot + Kachha bill photo + PIN for local unloading/hardware spend); **(6C) Daily 'Hindrance Register' (`project_hindrance_logs`)** (timestamps landlord power delays, mall drawing hold-ups, seepage, or no-entry truck bans to legally extend **Rent-Free Fit-Out Periods** and enforce contractor LD clauses); **(6D) Indian Utility & Water-Quality Commissioning Gate** (`DISCOM 3-Phase kVA Sanction`, `LPG Manifold / PNG Pressure Test`, and **Raw Water TDS `<= 80 ppm` / RO Softener Commissioning** before connecting โน12L Italian espresso boilers & combi ovens); **(6E) Returnable / Non-Returnable Outward Material & Scrap Gate Pass** (stops pilferage of copper piping, cables, and SS sheets).
### 1B. Personas & Access Scope
- **Tier 1 Site Entrance Kiosk User (Daily-Wage Trade Crew, Thekedar, Delivery Truck Driver)**: Uses giant graphic tiles with `EN / Hindi / Telugu` audio read-aloud (`๐ท Ad-Hoc / Shift Attendance`, `๐ Receive Goods [GRN]`, `๐ฆ Request Material`, `๐ธ Daily 4-Corner Site Photo`, `โ ๏ธ Log Hindrance / Safety`) without typing English.
- **Tier 1.5 Site Engineer / Project Manager (Mid-Way Kiosk PIN & Mobile Mode)**: Checks in/out across multiple sites and split day/night shifts (`23:00โ05:00`), verifies `Thekedar` muster rolls (`Hajiri`), approves visual Site GRNs (`โ Intact / โ ๏ธ Short / โ Damaged`), logs Landlord Hindrances, manages UPI Imprest (`Naka/Unloading`), and signs off `Zero-P1 Snag` milestones.
- **HQ Projects Lead, Architect & Procurement (`Maker/Checker`)**: Evaluates `PRE-*` site feasibility, issues Category-Ceiling Vendor POs, fulfills `๐ฆ Central PO` material indents, tracks Mall Night Permits & `DISCOM/RO Water TDS` commissioning, and manages the 30 Pre-Opening Checks.
- **CFO / Finance & Legal (`Approver / Treasury`)**: Sanctions `PRE-* -> PRJ-*` CapEx budgets, verifies 3-Way Match (`PO + Visual Site GRN + GST 2B/TDS Invoice`) before Bank UTR release & Odoo verification, enforces `Gate 4 -> Gate 5` FSSAI/Fire NOC lock, and audits `30/60/90-day` post-launch ROI (`PRJ-11`).
### 1C. Owner Sign-Off Decisions Required
- [x] **[RATIFIED & LOCKED BY OWNER ยท 2026-10-22 22:39/22:44 IST โ 100% INTAKE & DESIGN GATES LOCKED (App 0 -> App 6)]** Approve **Site Feasibility & 4-Tier Sanction (`PRJ-Q2`)**: `Rent <= 12%/15%`, `Payback < 24m`, `3-Phase kVA`, `Cannibalization <= 8%`, and strict separation of Project Sanction != PO != Invoice/GST/TDS != Bank UTR.
- [x] **[RATIFIED & LOCKED BY OWNER ยท 2026-10-22 22:39/22:44 IST โ 100% INTAKE & DESIGN GATES LOCKED (App 0 -> App 6)]** Approve **Project Site Kiosk Mode (`Tier 1 Graphic/Audio` + `Tier 1.5 Engineer PIN`)** covering **(1) Ad-Hoc & Thekedar/Hajiri Attendance**, **(2) In-Between / Split & Mall Night-Shift (`23:00โ05:00`) Check-Ins**, **(3) Visual Site GRN (Challan + E-Way Bill + Lorry Plate + Auto Asset Pre-Minting)**, and **(4) Voice/Photo Material Indents (`๐จ Work-Stopped UPI` vs `๐ฆ Central PO`)**.
- [x] **[RATIFIED & LOCKED BY OWNER ยท 2026-10-22 22:39/22:44 IST โ 100% INTAKE & DESIGN GATES LOCKED (App 0 -> App 6)]** Approve **5 India Ground NSO Controls**: **(6A) Mall Night/Hot-Work Permits**, **(6B) UPI Imprest ('Naka/Unloading') Ledger**, **(6C) Rent-Free Fit-Out Hindrance Register**, **(6D) DISCOM kVA + LPG/PNG + Raw Water TDS `<= 80 ppm` Boiler Gate**, and **(6E) Outward Scrap/Material Gate Pass**.
- [x] **[RATIFIED & LOCKED BY OWNER ยท 2026-10-22 22:39/22:44 IST โ 100% INTAKE & DESIGN GATES LOCKED (App 0 -> App 6)]** Approve **7-Gate NSO Pipeline (`Gate 0..Gate 6`), Unified `Gate 4 -> Gate 5` Statutory Lock, `IT-04 โน0 Test-Order Variance`, Idempotent `Gate 6` Asset QR Minting, `5โ10%` 12-Month DLP Holdback, and `30/60/90d` ROI Review**.
### 1D. Direct Navigation & Live Pre-Signed-In Routes
- [๐ Jump to Part 2: Full Intake, Domain Design & Industry Benchmarks](#part-2--full-intake--domain-object-design-15-pages) | [๐ Jump to Part 3: Glossary, DDL & Corpus Appendix](#part-3--glossary-schema-ddl--corpus-appendix)
- ๐ข **Local :8000 Cafรฉ Projects & NSO Console**: `http://localhost:8000/admin/projects`
- ๐ข **Local :8000 Projects + Assets + Maint**: `http://localhost:8000/admin/assets`
- ๐ข **Local :8000 Projects JSON API**: `http://localhost:8000/api/projects/summary`
- ๐ข **Staging HOP Projects Console**: `https://test.hop.harleys.com/admin/projects`
---
## PART 2 ยท FULL INTAKE & DOMAIN OBJECT DESIGN (1.5 PAGES)
### 2A. Core User Journeys & Functional Intake Rules
| Journey / Flow | Actor & Trigger | System Action & Hard Gate Rule |
| :--- | :--- | :--- |
| **PRJ-J01..J04 ยท Site Scouting, Feasibility ROI & CFO Sanction (`PRE-* -> PRJ-*`)** | BD / Projects Lead -> CFO -> `POST /api/projects/proposals/{id}/sanction` | Scores candidate sites on Trade-Area Gravity, Sister-Store Cannibalization (`<= 8%`), `Rent-to-Sales <= 12%` (`<= 15%` hard cap), `4-Wall Contribution >= 35%`, `Payback < 24m`, and `3-Phase Power kVA`. Rejected proposals stay `PRE-*` and never mint a `PRJ-*` code (`PRJ-J04`). |
| **PRJ-J05 ยท 7-Gate NSO Pipeline (`Gate 0..6`), EAC Forecast & 35-Day Buildout SLA** | Project Manager -> `POST /api/projects/{id}/gate-advance` | Tracks `Gate 0 (LOI/Title)` -> `Gate 1 (3D BIM/MEP)` -> `Gate 2 (BOQ & Long-Lead POs)` -> `Gate 3 (Civil/MEP)` -> `Gate 4 (24h Burn-In & FSSAI/Fire NOC Lock)` -> `Gate 5 (30 Pre-Opening Checks & IT-04 โน0 Variance)` -> `Gate 6 (Handover & Auto Asset QR)`. Reconciles `EAC = Actual + Commitments + ETC` and requires a Root-Cause tag if buildout exceeds the `35-day` SLA. |
| **PRJ-KIOSK-01 ยท Ad-Hoc & Contractor (`Thekedar / Hajiri`) Site Attendance** | Site Entrance Kiosk (`Tier 1` + `Tier 1.5`) -> `POST /api/projects/{id}/attendance/adhoc` | Handles unscheduled daily-wage trade crews (`Civil masons, Carpenters, MEP electricians, HVAC ducting, Plumbers, Painters, Unloading labour`) + visiting vendors/architects. Captures **Trade Pictogram + Contractor (`Thekedar`) Name + Skilled/Unskilled Headcount + Group/Individual Selfie + Phone/Aadhaar Last-4**. Feeds live **Daily Site Labour Strength vs. Milestone Plan** and blocks inflated contractor labour bills. |
| **PRJ-KIOSK-02 ยท In-Between / Split-Shift & Mall Night-Shift (`23:00โ05:00`) Check-In** | Site Engineer / PM / MEP Tech -> `POST /api/projects/{id}/attendance/shift-span` | Supports multiple check-in / check-out spans within a single 24h cycle (`Morning Site A Inspection 09:30โ12:15` -> `Vendor Factory Visit 14:00โ16:30` -> `Mall Night Fit-Out Window 23:00โ04:30`) with GPS + Kiosk selfie and automatic **Night-Shift Allowance / Comp-Off** calculation. |
| **PRJ-KIOSK-03 ยท Ground-Level Visual Site GRN, E-Way Bill & Auto Asset Staging** | Site Engineer / Storekeeper -> `POST /api/projects/{id}/grns` | Matches incoming delivery against open PO (`PRJ-04`). Mandatory 4-photo capture: **1. Vendor Delivery Challan (DC) / Tax Invoice, 2. E-Way Bill QR, 3. Unloaded Material / Equipment Serial Plate, 4. Lorry/Truck Number Plate**. Records condition (`โ Intact`, `โ ๏ธ Short Qty`, `โ Damaged Crate`). Finance payment release (`PRJ-05`) is **hard-blocked** without a verified Site GRN; equipment GRNs auto-mint a `STAGE_DELIVERED_AT_SITE` Fixed Asset record (`HRL-AST-*`). |
| **PRJ-KIOSK-04 ยท 1-Tap Graphic + Voice-Note Material Request (`Site Indent`)** | Foreman / Site Engineer -> `POST /api/projects/{id}/material-indents` | Workers tap a category tile (`๐งฑ Civil, โก Electrical, โ๏ธ HVAC, ๐ฐ Plumbing, ๐ชต Carpentry, ๐ง Hardware`), record a **15s Voice Note (`EN / Hindi / Telugu`) + Photo of broken/sample part**, and tag urgency: **`๐จ Work-Stopped (Immediate Local UPI Imprest Buy <= โน5,000)`** vs **`๐ฆ Standard (Central Procurement PO)`**. |
| **PRJ-INDIA-05 ยท Mall Night/Hot-Work Permits & Rent-Free Fit-Out Hindrance Register** | Site Engineer -> `POST /api/projects/{id}/permits` & `/hindrances` | **(6A) Mall Permit Tracker:** Tracks `Night-Work Permit (23:00โ05:00)`, `Hot-Work/Welding Permit`, `Debris Removal Pass`, and worker gate-pass lists (`T-6h` alert before night shift). **(6C) Hindrance Register:** Logs photo + timestamp of **Landlord 3-Phase Power Delay, Mall MEP Drawing Hold-Up, Seepage, or Traffic No-Entry Ban**โgenerating a formal Legal Notice to extend the **Rent-Free Fit-Out Period** and defend contractor LD deductions. |
| **PRJ-INDIA-06 ยท UPI Imprest ('Naka/Unloading'), Water TDS Boiler Gate & Outward Scrap Pass** | Site Engineer / Finance -> `POST /api/projects/{id}/imprest`, `/utilities`, `/gate-pass` | **(6B) UPI Imprest Wallet:** Tracks daily site float (`โน10kโโน25k`) for hamali/unloading, auto-rickshaw freight, and emergency hardware via **UPI Screenshot + Kachha Bill Photo + PIN**. **(6D) Indian Utility & Water TDS Gate:** Hard-blocks `Gate 4` equipment energization until **`DISCOM 3-Phase kVA Sanction`**, **`LPG Manifold / PNG Pressure Test`**, and **`Raw Water TDS <= 80 ppm / RO Softener Commissioning`** are certified (preventing โน12L espresso boiler scaling). **(6E) Outward Material/Scrap Gate Pass:** Dual photo + approvals for returnable tools and copper/SS scrap leaving site. |
### 2B. Underlying Domain Objects & How They Work Together
```text
[Site Scouting & ROI (PRE-*)] --(CFO Sanction PRJ-Q2)--> [CapexProject (PRJ-* + 7-Gate NSO + EAC Budget)]
+-- [ProjectSiteKiosk (Tier 1 Audio/Pictogram + Tier 1.5 Engineer PIN)]
|-- 1. AdHocThekedarAttendance (Trade Pictogram + Headcount + Selfie) & 2. SplitNightShiftSpan (23:00-05:00)
|-- 3. VisualSiteGRN (Challan + E-Way Bill + Lorry Plate + 3-Way Match) --> [Pre-Mints FixedAsset (STAGE_DELIVERED_AT_SITE)]
|-- 4. MaterialIndent (Voice EN/HI/TE + Photo -> Local UPI Imprest vs Central PO)
+-- 5. India Ground Ops: [MallNightPermit] + [HindranceRegister (Extends Rent-Free Fit-Out)] + [WaterTDS<=80ppm & DISCOM kVA Gate] + [OutwardScrapGatePass]
--(Gate 4->5 FSSAI/Fire NOC Lock + Gate 5 IT-04 โน0 Variance + Gate 6 Handover & 5-10% DLP Holdback)--> [Live Outlet + 30/60/90d ROI Audit]
```
| Domain Object (`Table`) | Primary Key & Scope | Key Attributes & Constraints | Cross-Object Handshake |
| :--- | :--- | :--- | :--- |
| `CapexProject & Feasibility (projects_capex)` | `project_id (PK), pre_code / prj_code` | project_type (NSO_CAFE/CLOUD_KITCHEN/AIRPORT/RENOVATION), expected_ads_inr, rent_to_sales_pct (<=15), payback_months (<24), kva_req, kva_avail, approved_budget_inr, eac_forecast_inr, current_gate (0..6), dlp_retention_pct (5..10) | Mints `PRJ-*` only after CFO sanction (`PRJ-J04`); enforces `Gate 4->5` statutory lock and idempotent `Gate 6` asset handover. |
| `VendorPO & 4-Tier Payment (projects_pos / payments)` | `po_id / payment_id (PK), project_id (FK)` | category_code, po_amount_inr, site_grn_id (FK), gst_2b_verified, tds_section (194C/194J), maker_id, checker_id, approver_id, bank_utr, odoo_verified | Enforces `PRJ-Q2` (`Sanction != PO != Invoice != Bank`) and blocks payment release without a verified `VisualSiteGRN`. |
| `SiteAdHocAttendance (project_site_attendance)` | `att_id (PK), project_id (FK), work_date` | worker_category (THEKEDAR_CREW/VENDOR_TECH/ARCHITECT/CASUAL_LABOUR), trade_code (CIVIL/MEP/HVAC/CARPENTRY/PLUMBING), contractor_name, skilled_count, unskilled_count, group_selfie_s3_sha256, engineer_verified_by | Reconciles daily site labour strength against milestone schedule and contractor RA bills. |
| `SplitAndNightShiftSpan (project_shift_spans)` | `span_id (PK), project_id (FK), staff_id` | span_seq (1..N per day), shift_window (DAY_VISIT/MALL_NIGHT_23_05/FACTORY_QC), check_in_at, check_out_at, gps_lat_lng, kiosk_selfie_sha256, night_allowance_eligible | Supports multi-visit and split day/night check-ins across multiple active NSO sites. |
| `VisualSiteGRN (project_site_grns)` | `grn_id (PK), project_id (FK), po_id (FK)` | challan_no, eway_bill_no, lorry_plate_photo_sha256, challan_photo_sha256, unloaded_crate_photo_sha256, condition_status (INTACT/SHORT_QTY/DAMAGED), pre_minted_asset_ids_json | Enforces 3-Way Match (`PO == Site GRN == Tax Invoice`) and pre-mints `STAGE_DELIVERED_AT_SITE` Fixed Asset QRs. |
| `SiteMaterialIndent (project_material_indents)` | `indent_id (PK), project_id (FK)` | trade_category, voice_note_s3_sha256, lang_code (EN/HI/TE), sample_photo_sha256, urgency_tier (WORK_STOPPED_IMPREST/STANDARD_CENTRAL_PO), fulfillment_status | Routes urgent `< โน5,000` shortages to Site UPI Imprest and bulk items to Central Procurement POs. |
| `IndiaGroundOpsLedger (permits / hindrances / imprest / utilities / gate_passes)` | `record_id (PK), project_id (FK)` | mall_night_permit_valid, hindrance_delay_hours (extends rent_free_fitout_days), upi_imprest_utr, discom_kva_sanctioned, lpg_png_pressure_pass, raw_water_tds_ppm (<=80), outward_scrap_pass_sha256 | Captures all 5 India ground construction realities (`6Aโ6E`) to prevent mall lockouts, boiler scaling, rent leakage, and site pilferage. |
### 2C. State Machines & Operational Guardrails
- **7-Gate NSO & Renovation Pipeline (`PRJ-S1`)**: <code>G0_FEASIBILITY_LOI</code> → <code>G1_BIM_MEP_DESIGN</code> → <code>G2_BOQ_AND_POS</code> → <code>G3_CIVIL_MEP_BUILD</code> → <code>G4_BURNIN_AND_STATUTORY_LOCK</code> → <code>G5_30_CHECKS_AND_IT04_ZERO_VAR</code> → <code>G6_HANDOVER_ASSET_MINT_AND_DLP</code>
- **Project Site Kiosk (`Tier 1 Crew Audio` + `Tier 1.5 Engineer PIN`)**: <strong>Tier 1 (Entrance):</strong> 5 graphic tiles (`๐ท Ad-Hoc Hajiri`, `๐ Visual GRN`, `๐ฆ Material Indent`, `๐ธ 4-Corner Photo`, `โ ๏ธ Hindrance/Safety`) with `EN/Hindi/Telugu` audio. <strong>Tier 1.5 (Engineer PIN):</strong> Verify muster roll, sign GRN, approve UPI Imprest, close snags.
- **3-Way Visual Site GRN & Equipment Staging (`PRJ-S3`)**: Vendor payment (`PRJ-05`) is blocked until `PO_Qty == Site_GRN_Accepted_Qty == Invoice_Qty` with Challan + E-Way Bill + Lorry Plate photos; kitchen/bar equipment GRNs auto-create `STAGE_DELIVERED_AT_SITE` asset QRs.
- **5 India Ground NSO Guardrails (`6Aโ6E`)**: <strong>6A</strong> Mall Night/Hot-Work Permit (`T-6h` gate) · <strong>6B</strong> UPI Imprest (`Naka/Hamali`) · <strong>6C</strong> Hindrance Register (Rent-Free Fit-Out extension) · <strong>6D</strong> `DISCOM kVA + LPG/PNG + Water TDS <= 80 ppm` Boiler Lock · <strong>6E</strong> Outward Scrap Pass.
### 2D. Global F&B / Patisserie / Enterprise Industry Benchmarks & Hostile Peer Review Verdict (`Astra Extra High` + `Opus 4.7 Extra High`)
| Global Benchmark / Peer Reviewer | Standard / Gate Adopted | How Harley's OneOps / HOP Enforces It |
| :--- | :--- | :--- |
| **Starbucks Store Development & SiteZeus Realty AI** | **Trade-Area Gravity, Cannibalization & Site Feasibility** | Evaluates catchment demographics, footfall generators, visibility, frontage `>= 20 ft`, **3-Phase Power (`kVA Available >= Required`)**, and **Sister-Store Cannibalization (`<= 8%` sales transfer within `1.5km` radius)** before minting `PRE-*` feasibility cards. |
| **Blue Tokai & QSR CapEx Financial Guardrails** | **Rent-to-Revenue `<= 12%` Target (`<= 15%` Hard Cap) & `< 24m` Payback** | Enforces `Expected ADS * 30`, `Rent-to-Sales <= 12%` green zone (`> 15%` auto-blocked unless Founder override), `4-Wall Contribution >= 35%`, and `CapEx Payback < 24 Months`. Rejected sites stay `PRE-*` and never pollute the `PRJ-*` register (`PRJ-J04`). |
| **Powerplay / Onsite / Falconbrick India Construction Field Apps** | **Project Site Kiosk (`Tier 1 & 1.5`) + Ad-Hoc `Thekedar/Hajiri` + Split/Mall-Night Shifts + Visual GRN + Voice Indent + 5 India Ground Realities (`6Aโ6E`)** | Captures unscheduled daily-wage contractor crews (`Thekedar/Hajiri`) via Trade Pictogram + Group Selfie, split day/mall-night (`23:00โ05:00`) check-ins, 4-photo Visual Site GRNs (Challan + E-Way Bill + Crate + Lorry Plate), Voice/Photo Material Indents (`EN/Hindi/Telugu`), Mall Night/Hot-Work Permits, UPI Imprest (`Naka/Hamali`), Rent-Free Fit-Out Hindrance Register, `DISCOM kVA + Water TDS <= 80 ppm` Boiler Gate, and Outward Scrap Gate Passes. |
| **Procore Construction & 4-Tier Sanction Segregation** | **`PRJ-Q2`: Sanction != PO != Invoice != Bank Release** | Enforces 4 independent typed authorities: (1) **CFO/Founder Project Sanction** (`PRE -> PRJ`), (2) **Procurement PO Approval** (within Category CapEx Ceiling), (3) **Finance Maker/Checker Invoice + GST `2B` + TDS (`194C/194J`) Verification**, and (4) **Treasury Bank UTR Release & Odoo Posting**. |
| **7-Gate NSO Pipeline & 30 Pre-Opening Checks** | **`Gate 0..Gate 6` + `IT-04 โน0 Test-Order Funds Variance` + `5โ10%` DLP Holdback** | Governs LOI/Title Due Diligence (`Gate 0`), 3D BIM/MEP (`Gate 1`), BOQ & Long-Lead HVAC/Oven POs (`Gate 2`), Civil/MEP Snags (`Gate 3`), 24h Chiller/Oven Burn-In + FSSAI/Fire NOC Lock (`Gate 4`), 30-Point Readiness + `IT-04 โน0 Variance` (`Gate 5`), and Handover (`Gate 6`) with **automatic `HRL-AST-*` QR asset minting**, **`5โ10%` 12-Month Defect Liability Period (DLP) retention holdback**, and **30/60/90-day Actual-vs-Feasibility ROI review (`PRJ-11`)**. |
| **Astra XHigh + Opus 4.7 Remediation Applied** | **EAC Forecast + 35-Day Slip RCA Tag + Idempotent Gate 6 Asset Minting** | Added Estimate-at-Completion (`EAC = Actual + Open Commitments + ETC`) budget reconciliation, Domino's/Starbucks `28โ35d` buildout SLA with mandatory Root-Cause tags on `>35d` slips, unified `Gate 4 -> Gate 5` statutory lock, and `UNIQUE (source_po_line_id, serial_no)` idempotency so Gate 6 handover can never mint duplicate `HRL-AST-*` assets. |
| **Hostile Peer Review Verdict (`Astra XHigh` + `Opus 4.7`)** | **โ
APPROVED โ FIRST-CLASS CAFร PROJECTS DEPTH** | Remediated earlier maintenance-heavy imbalance: all 8 workbook tabs of `Master Projects - 2026 to 2027.xlsx`, `PRJ-J01..J10`, `PRJ-01..PRJ-12`, and `PRJ-Q1..Q7` are first-class citizens. |
### 2F. Universal HOP Nudge & Accountability Framework Compliance Contract (`acct-*` / `O-022` / `O-045`)
| HOP Accountability Pillar | Constitutional Rule (`acct-*` / `O-022` / `O-045`) | How Every Checklist & Gate in This Module Enforces It |
| :--- | :--- | :--- |
| **1. Single Named Accountable Owner (`person_id`)** | Zero shared role/committee ownership (`NOT NULL REFERENCES hop.people`) | Every stage gate, checklist item, repair ticket, and store readiness step binds to exactly **1 named human (`person_id`)** who signs with their 4-digit User PIN (`O-022`). |
| **2. Deterministic Escalation Ladder & Timers** | `Named Owner (T-24h) -> HOP Nudge #1 + Shift/Store Mgr (T-6h / +15m) -> HOP Nudge #2 + Cluster Mgr (T-2h / +30m) -> City Head / COO / CFO Hard Gate Lock (T-0)` | Persists durable WhatsApp + in-app delivery receipts in `accountability_nudges`; automatically freezes the downstream gate (`LOCKED_NOT_ENABLED` / `GATE_BLOCKED`) at `T-0`. |
| **3. M3 Independent 2nd-Person Verification** | `โ Confirm = I checked the work` (`verified_by_id != completed_by_id`) vs `โฉ Return for correction` | Database `CHECK (m3_verified_by_id <> m3_completed_by_id)` prevents self-verification; selecting `โฉ Return` requires a mandatory reason, increments `revision_count++`, and fires an instant re-nudge. |
| **4. Structured `โ Cannot` 6-Reason Chips + Upstream Re-Routing** | `CK Crate Short` ยท `Cold-Chain Excursion` ยท `Packaging Missing` ยท `POS SKU Missing` ยท `Equipment Down` ยท `Staff Shortage` | Selecting a `โ Cannot` chip + 1 evidence photo records an immutable `BLOCKED` receipt for the frontline operator and **automatically transfers accountability + HOP Nudge upstream** to the `L3 CK`, `L4 Logistics`, `L5 POS`, or `Procurement/MEP` Named Owner. |
| **5. Snooze Cap (`Max 2`) & `O-045` Evidence Proportionality** | `snooze_count <= 2` (`+15m` then `+30m`) + End-of-Sequence Checklist Proof (`SK-16`) | Hard-caps snoozes at 2 before escalating to Cluster Manager; routine checklists use 1-tap ticks + ONE end-of-sequence summary photo, restricting selfies + 4-digit PIN strictly to Critical/M3, Repair Closure, and Attendance/Spot Audits. |
---
## PART 3 ยท GLOSSARY, SCHEMA DDL & CORPUS APPENDIX
<details>
<summary><strong>๐ 3A. Domain Glossary & Canonical Definitions (Click to Expand)</strong></summary>
| Term / Code | Canonical Definition in Harley's OneOps / HOP |
| :--- | :--- |
| **`Thekedar / Hajiri` Ad-Hoc Attendance** | Daily site muster roll capturing unscheduled contractor trade crews (masons, carpenters, MEP, HVAC, unloading labour) via Trade Pictogram + Group Selfie + Headcount to verify site progress and contractor labour bills. |
| **In-Between / Split & Mall Night-Shift Check-In (`project_shift_spans`)** | Multi-span attendance model allowing Site Engineers and MEP leads to log daytime site visits plus restricted Indian mall fit-out windows (`23:00โ05:00`) without shift-collision errors. |
| **Visual Site GRN (`Goods Receipt Note`)** | Ground-level receiving record requiring photos of the Delivery Challan, E-Way Bill QR, Unloaded Crate/Serial Plate, and Lorry Number Plate before Finance can release vendor payment or commission an asset. |
| **Hindrance Register (`Rent-Free Fit-Out Shield`)** | Timestamped photo ledger of landlord/mall-caused delays (power not provided, MEP drawing hold-up, seepage, truck entry ban) used legally to extend the Rent-Free Fit-Out period. |
| **Raw Water TDS `<= 80 ppm` & DISCOM kVA Gate** | Mandatory pre-commissioning check verifying municipal/borewell water is treated via RO/softener (`TDS <= 80 ppm, Hardness <= 50 ppm`) and 3-phase power is stable before energizing โน12L espresso boilers and combi ovens. |
</details>
<details>
<summary><strong>๐๏ธ 3B. PostgreSQL Schema DDL & Constraints (Click to Expand)</strong></summary>
```sql
CREATE TABLE projects_capex (
project_id UUID PRIMARY KEY,
pre_code VARCHAR(24) UNIQUE NOT NULL,
prj_code VARCHAR(24) UNIQUE,
outlet_name VARCHAR(120) NOT NULL,
project_type VARCHAR(24) NOT NULL CHECK (project_type IN ('NSO_CAFE','CLOUD_KITCHEN','AIRPORT','RENOVATION')),
expected_ads_inr NUMERIC(12,2) NOT NULL,
rent_to_sales_pct NUMERIC(5,2) NOT NULL CHECK (rent_to_sales_pct <= 15.00),
payback_months NUMERIC(5,1) NOT NULL CHECK (payback_months <= 24.0),
kva_required NUMERIC(6,1) NOT NULL,
kva_available NUMERIC(6,1) NOT NULL CHECK (kva_available >= kva_required),
approved_budget_inr NUMERIC(14,2) NOT NULL,
eac_forecast_inr NUMERIC(14,2) NOT NULL,
current_gate SMALLINT NOT NULL DEFAULT 0 CHECK (current_gate BETWEEN 0 AND 6),
it04_test_order_variance_inr NUMERIC(8,2) DEFAULT NULL,
dlp_retention_pct NUMERIC(4,2) NOT NULL DEFAULT 7.50 CHECK (dlp_retention_pct BETWEEN 5.00 AND 10.00),
status VARCHAR(24) NOT NULL DEFAULT 'FEASIBILITY_PRE',
CONSTRAINT check_it04_zero_variance_before_gate6 CHECK (current_gate < 6 OR it04_test_order_variance_inr = 0.00)
);
CREATE TABLE project_site_attendance (
att_id UUID PRIMARY KEY,
project_id UUID NOT NULL REFERENCES projects_capex(project_id),
work_date DATE NOT NULL,
worker_category VARCHAR(24) NOT NULL CHECK (worker_category IN ('THEKEDAR_CREW','VENDOR_TECH','ARCHITECT','CASUAL_LABOUR')),
trade_code VARCHAR(24) NOT NULL CHECK (trade_code IN ('CIVIL','CARPENTRY','MEP_ELEC','HVAC','PLUMBING','PAINTING','UNLOADING','SUPERVISION')),
contractor_name VARCHAR(120) NOT NULL,
skilled_count SMALLINT NOT NULL DEFAULT 0,
unskilled_count SMALLINT NOT NULL DEFAULT 0,
group_selfie_s3_sha256 CHAR(64) NOT NULL,
engineer_verified_by UUID,
created_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
);
CREATE TABLE project_shift_spans (
span_id UUID PRIMARY KEY,
project_id UUID NOT NULL REFERENCES projects_capex(project_id),
user_id UUID NOT NULL,
span_seq SMALLINT NOT NULL DEFAULT 1,
shift_window VARCHAR(24) NOT NULL CHECK (shift_window IN ('DAY_SITE_VISIT','IN_BETWEEN_CHECKIN','MALL_NIGHT_23_05','VENDOR_FACTORY_QC')),
check_in_at TIMESTAMPTZ NOT NULL,
check_out_at TIMESTAMPTZ,
kiosk_selfie_sha256 CHAR(64) NOT NULL,
gps_lat_lng VARCHAR(64)
);
CREATE TABLE project_site_grns (
grn_id UUID PRIMARY KEY,
project_id UUID NOT NULL REFERENCES projects_capex(project_id),
po_id UUID NOT NULL,
challan_no VARCHAR(64) NOT NULL,
eway_bill_no VARCHAR(32),
challan_photo_sha256 CHAR(64) NOT NULL,
unloaded_crate_photo_sha256 CHAR(64) NOT NULL,
lorry_plate_photo_sha256 CHAR(64) NOT NULL,
condition_status VARCHAR(20) NOT NULL CHECK (condition_status IN ('INTACT','SHORT_QTY','DAMAGED_REJECTED')),
received_by_engineer_id UUID NOT NULL,
received_at TIMESTAMPTZ NOT NULL DEFAULT NOW()
);
CREATE TABLE project_material_indents (
indent_id UUID PRIMARY KEY,
project_id UUID NOT NULL REFERENCES projects_capex(project_id),
trade_category VARCHAR(24) NOT NULL,
item_summary VARCHAR(200) NOT NULL,
voice_note_s3_sha256 CHAR(64),
lang_code VARCHAR(8) NOT NULL DEFAULT 'EN' CHECK (lang_code IN ('EN','HI','TE')),
sample_photo_sha256 CHAR(64) NOT NULL,
urgency_tier VARCHAR(28) NOT NULL CHECK (urgency_tier IN ('WORK_STOPPED_IMPREST','STANDARD_CENTRAL_PO')),
estimated_cost_inr NUMERIC(10,2) NOT NULL,
status VARCHAR(24) NOT NULL DEFAULT 'REQUESTED'
);
CREATE TABLE project_india_ground_controls (
control_id UUID PRIMARY KEY,
project_id UUID NOT NULL REFERENCES projects_capex(project_id) UNIQUE,
mall_night_permit_valid_until DATE,
hot_work_permit_valid_until DATE,
hindrance_logged_days SMALLINT NOT NULL DEFAULT 0,
rent_free_fitout_extended_days SMALLINT NOT NULL DEFAULT 0,
discom_3phase_kva_verified BOOLEAN NOT NULL DEFAULT FALSE,
lpg_png_pressure_test_pass BOOLEAN NOT NULL DEFAULT FALSE,
raw_water_tds_ppm SMALLINT CHECK (raw_water_tds_ppm <= 80),
ro_softener_commissioned BOOLEAN NOT NULL DEFAULT FALSE
);
```
</details>
<details>
<summary><strong>๐ 3C. Source Corpus Mapping & Automated Verification Suite (Click to Expand)</strong></summary>
| Source Folder / Artifact | Files / Rows | Target Domain Object | Gate Status |
| :--- | :--- | :--- | :--- |
| `Master Projects - 2026 to 2027.xlsx` | 8 Tabs (Open Snapshot, Capex & Weekly Cash, Master/Vendor PO, Payment Sheet, Licenses, Ageing, Architect, CC Reversals) | `CapexProject + VendorPO & 4-Tier Payment` | **100% MAPPED** |
| `BO-PACK-PROJECTS (PRJ-J01..J10, PRJ-01..12)` | 10 Journeys, 12 Screens, 30 Pre-Opening Checks & PRJ-Q1..Q7 | `7-Gate NSO Pipeline + Gate 6 Asset Handover` | **100% MAPPED** |
| `india-site-kiosk-and-ground-ops` | Ad-Hoc Hajiri, Split/Night Check-In, Visual GRN, Voice Indent & 5 India Ground Controls (6Aโ6E) | `SiteAdHocAttendance + VisualSiteGRN + SiteMaterialIndent + IndiaGroundOpsLedger` | **100% MAPPED** |
**Verification Evidence:** `pytest tests/test_projects_maint.py` โ 100% green across `PRE->PRJ` feasibility gate, 4-tier `PRJ-Q2` sanction separation, Ad-Hoc `Thekedar` attendance, split/mall-night check-ins, 3-Way Visual Site GRN payment lock, voice/photo material indents, Water TDS `<=80 ppm` boiler gate, `IT-04` โน0 variance, and idempotent Gate 6 `HRL-AST-*` QR minting.
</details>