LOCAL LOCAL DEV ENVIRONMENT (localhost:8000) โ€” Synthetic / Local Test Data Only
Projects
Super AdminSuper Admin
Logged in as: Super Admin (Super Admin · All Outlets ยท NAN)
Morning cold-chain & hygiene check-in activeSNKComing soonLicencesComing soonDisplaysComing soonFiltersComing soon
Needs you now41
Needs you
UrgentBLR- New Bel Road is offline on ownly
Open
UrgentHarley's Special Mawa Bar Cake (250 Gms) sold out across Vijayawada
Open
More ›● 3.3% below last Thursday at 9:45 pm
🏛 HARLEY'S COMPANY BANNER · Q4 Patisserie Quality & Cold-Chain Zero-Tolerance Drive — Sequence Proof & Rista Top-20 Stock-Out SLA (15m) active across all 29 outlets. Directive O-047 · All Outlets
🚨 NUDGE ALERTS (2 CRITICAL · 3 IMPORTANT):
✓ Open & Ack
Showing: Today · All 4 Cities (29)
Showing: Today · All cities · All types · All outlets (29) · All brands
Outlet Summary

Cafรฉ Projects: Store Rollout Pipeline & India Site Field Ops

Five gates from site feasibility to launch โ€” plus ground-level Indian project site operations: Site Entrance Kiosk Mode, Ad-Hoc Contractor Attendance (Hajiri), In-Between Split-Shift Check-In, Site GRN (DC + E-Way Bill), Material Indents, and Landlord Hindrance / Mall Night Permits.

Active Store Rollouts3 StoresHYD (JHF, KOK) · BLR (IND)
Total Approved CapExโ‚น2.97 Crโ‚น2.68 Cr committed (90.2%)
Avg Estimated Payback14.5 moTarget < 24.0 months
BOQ Assets to Commission46 / 54Auto-seeded into Asset Registry
Pre-Opening Licences19 / 24Linked to Compliance Vault
HOP Nudge & Accountability Framework: Single Named Owner (person_id) ยท Escalation Chain: Named Owner (0m) โ†’ Shift/Store Mgr (+15m / T-6h) โ†’ Cluster Mgr (+30m / T-2h) โ†’ City/CFO Lock (T-0) ยท M3 Independent Verification: Confirm = I checked the work vs Return for correction (Self-confirmation blocked) ยท Structured โœ• Cannot Reason Chips: Auto-routes upstream blockers without penalizing site crew ยท O-045 Evidence Proportionality: 1-Tap / Sequence Proof routine ยท Live Selfie + 4-Digit PIN on 3 high-trust triggers

Active Store Rollout Pipeline Board (5-Gate Execution)

Gate 4 BOQ Auto-Commissions into Enterprise Asset Registry
Harley's - HYD - Jubilee Hills Flagship PRJ-HYD-002 Branch: JHF Feasibility APPROVED
Gate: 4 ยท Equipment, Cold-Chain & IT Commissioning
Hyderabad ยท CAFE Format ยท Target open 2026-12-12 ยท Mandatory Pre-Opening Checklist: 8/22
1 ยท Site & Business Feasibility2 ยท Capex & Design Approval3 ยท Civil, MEP & Victorian Fit-Out4 ยท Equipment, Cold-Chain & IT Commissioning5 ยท Pre-Opening Checklist & HandoverLaunched
Rent-to-Sales (limit 15%)
13.33%
Within limit
Estimated payback (limit under 24 months)
13.8 months
Within limit
Power load (kVA available vs required)
50.0 / 45.0 kVA
OK
Planning basis
Sales = daily sales ร— 30. Payback = capex รท (sales ร— 35% โˆ’ rent).
CapEx Budget vs Actual & BOQ Handover
Budget: โ‚น9,000,000 · Actual Committed: โ‚น7,920,000
14 / 18 BOQ Equipment Assets Tagged (Deck Oven, La Marzocco, Cold-Chain Chiller)
Linked Pre-Opening Statutory Licences
FSSAI Displayed (CMP-01 Done) ยท Fire NOC & Trade Licence in S3 Vault
Test Order Funds Reconciliation: Pending IT-04 Sign-Off
Open 30-Point Launch Checklist โ†’
Harley's - HYD - Kokapet Neopolis Flagship Cafรฉ PRJ-HYD-003 Branch: KOK Feasibility APPROVED
Gate: 3 ยท Civil, MEP & Victorian Fit-Out
Hyderabad ยท CAFE Format ยท Target open 2026-11-28 ยท Mandatory Pre-Opening Checklist: 18/24
1 ยท Site & Business Feasibility2 ยท Capex & Design Approval3 ยท Civil, MEP & Victorian Fit-Out4 ยท Equipment, Cold-Chain & IT Commissioning5 ยท Pre-Opening Checklist & HandoverLaunched
Rent-to-Sales (limit 15%)
12.40%
Within limit
Estimated payback (limit under 24 months)
14.6 months
Within limit
Power load (kVA available vs required)
60.0 / 45.0 kVA
OK
Planning basis
Sales = daily sales ร— 30. Payback = capex รท (sales ร— 35% โˆ’ rent).
CapEx Budget vs Actual & BOQ Handover
Budget: โ‚น9,200,000 · Actual Committed: โ‚น7,450,000
14 / 18 Kitchen & Cold-Chain BOQ Assets Delivered to Site
Linked Pre-Opening Statutory Licences
FSSAI Applied ยท Fire NOC Approved ยท Trade Licence Issued
Test Order Funds Reconciliation: Pending IT-04 Sign-Off
Harley's - BLR - Indiranagar 100ft Road Roastery PRJ-BLR-004 Branch: IND Feasibility APPROVED
Gate: 5 ยท Pre-Opening Checklist & Handover
Bengaluru ยท CAFE Format ยท Target open 2026-11-05 ยท Mandatory Pre-Opening Checklist: 23/24
1 ยท Site & Business Feasibility2 ยท Capex & Design Approval3 ยท Civil, MEP & Victorian Fit-Out4 ยท Equipment, Cold-Chain & IT Commissioning5 ยท Pre-Opening Checklist & HandoverLaunched
Rent-to-Sales (limit 15%)
13.80%
Within limit
Estimated payback (limit under 24 months)
15.2 months
Within limit
Power load (kVA available vs required)
65.0 / 50.0 kVA
OK
Planning basis
Sales = daily sales ร— 30. Payback = capex รท (sales ร— 35% โˆ’ rent).
CapEx Budget vs Actual & BOQ Handover
Budget: โ‚น11,500,000 · Actual Committed: โ‚น11,180,000
18 / 18 BOQ Assets Commissioned & Handed Over to Asset Registry
Linked Pre-Opening Statutory Licences
All 8 Statutory Licences Active in S3 Vault
Test Order Funds Reconciliation: Pending IT-04 Sign-Off
5 · Project Site Entrance Kiosk & Site Engineer Mid-Way Mode (EN | HI Pictorial Interface)

Ground-Level Project Site Kiosk · PRJ-HYD-003 (Kokapet Neopolis) & PRJ-HYD-002 (Jubilee Hills)

Zero-typing pictorial touch tiles for Civil/MEP Contractors (Thekedars), Lorry Gate Unloading, and Site Engineers (4-Digit PIN Mid-Way Mode).
EN | HI (Hajiri / Challan / Indent) Offline-First Photo Queue Launch Site Entrance Kiosk Mode →

1 & 2 · Ad-Hoc Contractor Attendance (Hajiri) & In-Between Split-Shift Check-In

Tracks daily-wage contractor gangs (Civil, HVAC, Carpentry Thekedars) without permanent HR profiles, plus multiple in-between shift spans for Site Engineers and NSO trainers bridging day inspections and mall night-work windows.
13 Total Site Headcount Logged
Log IDWorker / Contractor Gang (Thekedar)Attendance ModeHeadcountShift Span / In-Between WindowStatus
ATT-KOK-003
PRJ-HYD-002
CoolAir HVAC Ducting Team
MEP / HVAC & Exhaust
AD-HOC / CONTRACTOR MUSTER (HAJIRI)4 Person(s)
Checked in 11:00 ยท Ad-Hoc Check-in (Brazing & Hood Ducting)
Via: Site Entrance Kiosk
ON_SITE
ATT-KOK-002
PRJ-HYD-003
Ramesh Verma (Site Engineer)
Project Site Engineer
IN-BETWEEN SPLIT SHIFT1 Person(s)
In-Between Split Shift: Span 1 [10:30โ€“14:15 Daytime Inspection] + Span 2 [23:00โ€“03:30 Mall Night-Work Window]
Via: Site Engineer Mid-Way Mode (PIN)
SPLIT_SHIFT_ACTIVE
ATT-KOK-001
PRJ-HYD-003
Civil Masonry Crew (Thekedar Raju)
Civil & Victorian Plaster
AD-HOC / CONTRACTOR MUSTER (HAJIRI)8 Person(s)
Checked in 09:15 ยท Ad-Hoc Muster Roll (Hajiri)
Via: Site Entrance Kiosk (Photo + Supervisor PIN)
ON_SITE

3 · Site Goods Receipt Note (GRN) with Delivery Challan (DC), E-Way Bill & BOQ Auto-Tagging

Every lorry arriving at an under-construction site is checked against BOQ POs. Intact capital equipment auto-stages a Harley's Asset Tag (HRL-AST-*); short or damaged deliveries automatically hold vendor milestone payouts.
3-Way BOQ Match + Asset Tag Staging
GRN IDMaterial / BOQ Equipment ReceivedDelivery Challan (DC) & E-Way BillQty (Rec / Ord)Site ConditionAsset Tag / Payout Gate
GRN-KOK-019
PRJ-HYD-003
Kajaria Vitrified BOH Anti-Skid Tiles (120 Boxes)
Lorry Stack Photo + Signed Short-DC Uploaded
DC #9104
EWB-361099310092 (Verified) · Lorry TS07-HG-1920
112 / 120โš ๏ธ Short (112/120 received)HOLD-MILESTONE-PAYOUT (Short 8 Boxes ยท 112/120 received)
By Ramesh Verma (Site Engineer)
GRN-KOK-018
PRJ-HYD-003
La Marzocco Linea PB 3-Group + Mazzer Grinder
DC Photo + Uncrating Serial Plate Photo in S3
DC #8841
EWB-361099284410 (Verified) · Lorry TS09-UB-4412
2 / 2โœ“ IntactHRL-AST-KOK-ESP-01
By Ramesh Verma (Site Engineer)

4 · Request Material (Site Material Indent · Urgent Local Buy vs Central PO)

Prevents fit-out gangs from sitting idle when short of copper piping, adhesive, cables, or grout. Foremen can raise a Site Indent from the Kiosk and route it to Central PO or Urgent Local Imprest Buy.
2 Active Material Indents
Indent IDMaterial & Trade CategoryQty NeededUrgencyFulfilment PathStatus
IND-205
PRJ-HYD-002
Fosroc Waterproofing Grout (25 bags)
Civil & BOH Wet-Area
25 bagsNEXT_DAYCENTRAL_PO
By Thekedar Raju (Civil Supervisor)
CENTRAL_PO_ISSUED
IND-204
PRJ-HYD-003
15mm Copper Refrigerant Pipe (40 ft) + Insulation
MEP / Cold-Chain Piping
40 ft + 12 rollsWORK_STOPPED_URGENTURGENT_LOCAL_BUY
By HVAC Foreman via Voice+Photo on Site Kiosk
APPROVED_LOCAL_BUY

6 · India Ground-Level NSO Site Realities (Mall Night Permits, Hindrance Rent-Free Claims, UPI Imprest & RO TDS Gate)

Purpose-built controls for Indian commercial fit-out realities: Landlord Hindrance Register (protects rent-free fit-out period), Mall Night-Work Gate-Passes (23:00-06:00), Mathadi/Hamali UPI Petty Cash, and <80 ppm RO Water TDS Boiler Gate.
India NSO Field Governance Active
UTL-KOK-01 · UTILITY_TDS_GATE62 ppm TDS ยท 60 kVA Ready (Boiler Protected)
3-Phase 60 kVA Load & RO Water TDS (<80 ppm) Boiler Protection Gate
3-Phase stabilizer + dedicated earthing pit (0.9 Ohm) tested; Hydrotech RO permeate measured at 62 ppm TDS before La Marzocco boiler fill.
Ref: TDS-62PPM-OK · Logged by CafรฉTech Lead Arvind
UPI-KOK-01 · PETTY_CASH_UPIโ‚น3,250 UPI Imprest Verified
Mathadi / Lorry Unloading Hamali & Local Hardware Fasteners
Unloading 3-Deck Sveba Oven + La Marzocco crate at site gate (โ‚น2,400) + GI anchor bolts (โ‚น850) with kachha slip photo.
Ref: UPI-429511802911 · Logged by Ramesh Verma
PRM-KOK-01 · MALL_PERMITGate-Pass #GP-9921 Active (23:00โ€“06:00)
Mall Night-Work & Core-Cutting Permit (23:00โ€“06:00 Window)
Security Gate-Pass for 12 workers + core-cutting & BOH welding Hot-Work permit approved by Neopolis Facility Office.
Ref: GP-9921 · Logged by Ramesh Verma
HND-KOK-01 · HINDRANCE+6 Days Rent-Free Fit-Out Extension Claimed
Landlord 3-Phase 60 kVA Cable Termination & MEP Drawing Hold-Up
Building facility team delayed main LT panel tap-off by 6 days; logged with timestamped site photo for rent-free fit-out extension.
Ref: HND-LOG-014 · Logged by Ramesh Verma

7 · PRJ-Q2 4-Tier CapEx Authority Matrix (Sanction ≠ PO ≠ Invoice/GST ≠ Bank UTR)

Maker-checker separation of duties across all 4 financial release tiers. The same actor cannot approve both PO/Invoice and Bank UTR release, and milestone UTR payouts are automatically held when a linked Site GRN is short or damaged.
PRJ-Q2 Maker-Checker Enforced
Package IDBOQ CapEx Package1 ยท Sanction2 ยท PO Issued3 ยท GST Invoice + Site GRN4 ยท Bank UTR ReleaseStatus
CPX-KOK-01
PRJ-HYD-003
La Marzocco Linea PB 3-Group + Mazzer Grinder
โ‚น8,40,000 · Linked GRN-KOK-018 (Intact)
โœ“ CFO Srinivas PO-HRL-8812
Procurement Lead Vikram
GST-INV-36AABCH9912
Site Engineer Ramesh
HDFC26102299104
Finance Controller Meera
UTR_RELEASED
CPX-KOK-02
PRJ-HYD-003
Kajaria Vitrified BOH Anti-Skid Tiles (120 Boxes)
โ‚น3,60,000 · Linked GRN-KOK-019 (Short 8 Boxes)
โœ“ CFO Srinivas PO-HRL-8840
Procurement Lead Vikram
โณ Short GRN Hold (112/120) โœ• Blocked until Short-Supply Replaced HOLD_SHORT_GRN

Business Feasibility Calculator (Gate 1 ยท New Site Evaluation)

Evaluates Rent-to-Sales (≤ 15%), CapEx Payback (< 24 months), and 3-Phase Electrical Load (kVA) before CapEx approval.
35% Four-Wall Contribution Basis