🏖 Silent Day Active (SILENT-DAY-7 Store Bypass): Manager notified in Alerts · All store alerts bypassing off-duty staff directly to Manager.
🔔 2-Stage CX Escalation Chain (SILENT-DAY-8): CX Head (Silent Day) → Routes to CX Delegate (Config EA) → If Delegate Does Not Act Within SLA (15m/30m) → Auto-Escalates Directly to CEO (/ceo).
Showing: Today · All cities · All types · All outlets (29) · All brands
Café Projects: Store Rollout Pipeline & India Site Field Ops
Five gates from site feasibility to launch — plus ground-level Indian project site operations: Site Entrance Kiosk Mode, Ad-Hoc Contractor Attendance (Hajiri), In-Between Split-Shift Check-In, Site GRN (DC + E-Way Bill), Material Indents, and Landlord Hindrance / Mall Night Permits.
5 · Project Site Entrance Kiosk & Site Engineer Mid-Way Mode (EN | HI Pictorial Interface)
Tracks daily-wage contractor gangs (Civil, HVAC, Carpentry Thekedars) without permanent HR profiles, plus multiple in-between shift spans for Site Engineers and NSO trainers bridging day inspections and mall night-work windows.
13 Total Site Headcount Logged
Log ID
Worker / Contractor Gang (Thekedar)
Attendance Mode
Headcount
Shift Span / In-Between Window
Status
ATT-KOK-003
PRJ-HYD-002
CoolAir HVAC Ducting Team
MEP / HVAC & Exhaust
AD-HOC / CONTRACTOR MUSTER (HAJIRI)
4 Person(s)
Checked in 11:00 · Ad-Hoc Check-in (Brazing & Hood Ducting)
3 · Site Goods Receipt Note (GRN) with Delivery Challan (DC), E-Way Bill & BOQ Auto-Tagging
Every lorry arriving at an under-construction site is checked against BOQ POs. Intact capital equipment auto-stages a Harley's Asset Tag (HRL-AST-*); short or damaged deliveries automatically hold vendor milestone payouts.
4 · Request Material (Site Material Indent · Urgent Local Buy vs Central PO)
Prevents fit-out gangs from sitting idle when short of copper piping, adhesive, cables, or grout. Foremen can raise a Site Indent from the Kiosk and route it to Central PO or Urgent Local Imprest Buy.
2 Active Material Indents
Indent ID
Material & Trade Category
Qty Needed
Urgency
Fulfilment Path
Status
IND-205
PRJ-HYD-002
Fosroc Waterproofing Grout (25 bags)
Civil & BOH Wet-Area
25 bags
NEXT_DAY
CENTRAL_PO
By Thekedar Raju (Civil Supervisor)
CENTRAL_PO_ISSUED
IND-204
PRJ-HYD-003
15mm Copper Refrigerant Pipe (40 ft) + Insulation
MEP / Cold-Chain Piping
40 ft + 12 rolls
WORK_STOPPED_URGENT
URGENT_LOCAL_BUY
By HVAC Foreman via Voice+Photo on Site Kiosk
APPROVED_LOCAL_BUY
6 · India Ground-Level NSO Site Realities (Mall Night Permits, Hindrance Rent-Free Claims, UPI Imprest & RO TDS Gate)
Purpose-built controls for Indian commercial fit-out realities: Landlord Hindrance Register (protects rent-free fit-out period), Mall Night-Work Gate-Passes (23:00-06:00), Mathadi/Hamali UPI Petty Cash, and <80 ppm RO Water TDS Boiler Gate.
Security Gate-Pass for 12 workers + core-cutting & BOH welding Hot-Work permit approved by Neopolis Facility Office.
Ref: GP-9921 · Logged by Ramesh Verma
HND-KOK-01 · HINDRANCE+6 Days Rent-Free Fit-Out Extension Claimed
Landlord 3-Phase 60 kVA Cable Termination & MEP Drawing Hold-Up
Building facility team delayed main LT panel tap-off by 6 days; logged with timestamped site photo for rent-free fit-out extension.
Ref: HND-LOG-014 · Logged by Ramesh Verma
7 · PRJ-Q2 4-Tier CapEx Authority Matrix (Sanction ≠ PO ≠ Invoice/GST ≠ Bank UTR)
Maker-checker separation of duties across all 4 financial release tiers. The same actor cannot approve both PO/Invoice and Bank UTR release, and milestone UTR payouts are automatically held when a linked Site GRN is short or damaged.
PRJ-Q2 Maker-Checker Enforced
Package ID
BOQ CapEx Package
1 · Sanction
2 · PO Issued
3 · GST Invoice + Site GRN
4 · Bank UTR Release
Status
CPX-KOK-01
PRJ-HYD-003
La Marzocco Linea PB 3-Group + Mazzer Grinder
₹8,40,000 · Linked GRN-KOK-018 (Intact)
✓ CFO Srinivas
PO-HRL-8812
Procurement Lead Vikram
GST-INV-36AABCH9912
Site Engineer Ramesh
HDFC26102299104
Finance Controller Meera
UTR_RELEASED
CPX-KOK-02
PRJ-HYD-003
Kajaria Vitrified BOH Anti-Skid Tiles (120 Boxes)
₹3,60,000 · Linked GRN-KOK-019 (Short 8 Boxes)
✓ CFO Srinivas
PO-HRL-8840
Procurement Lead Vikram
⏳ Short GRN Hold (112/120)
✕ Blocked until Short-Supply Replaced
HOLD_SHORT_GRN
Active Store Rollouts3 StoresHYD (JHF, KOK) · BLR (IND)
Total Approved CapEx₹2.97 Cr₹2.68 Cr committed (90.2%)
Avg Estimated Payback14.5 moTarget < 24.0 months
BOQ Assets to Commission46 / 54Auto-seeded into Asset Registry
Pre-Opening Licences19 / 24Linked to Compliance Vault
HOP Nudge & Accountability Framework: Single Named Owner (person_id)· Escalation Chain:Named Owner (0m) → Shift/Store Mgr (+15m / T-6h) → Cluster Mgr (+30m / T-2h) → City/CFO Lock (T-0)· M3 Independent Verification:Confirm = I checked the work vs Return for correction (Self-confirmation blocked)· Structured ✕ Cannot Reason Chips: Auto-routes upstream blockers without penalizing site crew· O-045 Evidence Proportionality: 1-Tap / Sequence Proof routine · Live Selfie + 4-Digit PIN on 3 high-trust triggers
Active Store Rollout Pipeline Board (5-Gate Execution)
Gate 4 BOQ Auto-Commissions into Enterprise Asset Registry
Harley's - HYD - Jubilee Hills FlagshipPRJ-HYD-002Branch: JHFFeasibility APPROVED
Gate: 4 · Equipment, Cold-Chain & IT Commissioning
Hyderabad · CAFE Format · Target open 2026-12-12 · Mandatory Pre-Opening Checklist: 8/22
1 · Site & Business Feasibility2 · Capex & Design Approval3 · Civil, MEP & Victorian Fit-Out4 · Equipment, Cold-Chain & IT Commissioning5 · Pre-Opening Checklist & HandoverLaunched